ABC 2018 New TV Shows – 8 New Series Join the ABC Slate

ABC Primetime Schedule 2018-19

It is the time of announcing what’s new and what’ renewed for the 2018-19 season of TV Shows. While ABC may not be the most watched channel in America, many of the shows on the channel are right up there on the ranking list. Roseanne revival released in 2018 became the top show of the last season, along with the medical drama The Good Doctor. With a couple more releases scheduled this year, ABC 2018 New TV Shows list makes impressive additions. Checkout what new TV shows are in store for you and add them to your list.

ABC 2018 New TV Shows

ABC Primetime Schedule 2018-19

ABC 2018 New TV Shows list adds to the exciting renewals of the best performing series of the last year. The new slate of shows comes with a mix of comedies, dramas that you can watch with the entire family and action and investigation series that will give you the much needed thrills.

 

A Million Little Things

ABC 2018 New TV Shows - A MILLION LITTLE THINGS ABC

They say friendship isn’t one big thing, it’s a million little things; and that’s true for a group of friends from Boston who bonded under unexpected circumstances. Some have achieved success, others are struggling in their careers and relationships, but all of them feel stuck in life. After one of them dies unexpectedly, it’s just the wake-up call the others need to finally start living. Along the way, they discover that friends may be the one thing to save them from themselves.

The Fix

ABC 2018 New TV Shows - THE FIX on ABC

Attorney and author Marcia Clark co-writes and executive produces a new legal drama about Maya Travis, an L.A. district attorney who suffers a devastating defeat when prosecuting an A-list actor for double murder. With her high-profile career derailed, she flees for a quieter life in Washington. Eight years later when this same celebrity is under suspicion for another murder, Maya Travis is lured back to the DA’s office for another chance at justice.


Grand Hotel

ABC 2018 New TV Shows - GRAND HOTEL on ABC

Eva Longoria executive produces this bold, provocative drama set at the last family-owned hotel in multicultural Miami Beach. Charismatic Santiago Mendoza owns the hotel, while his glamorous second wife, Gigi, and their adult children enjoy the spoils of success. The hotel’s loyal staff round out a contemporary, fresh take on an upstairs/downstairs story. Wealthy and beautiful guests bask in luxury, but scandals, escalating debt and explosive secrets hide beneath the picture-perfect exterior. The show is based on the Spanish series.

The Kids Are Alright

ABC 2018 New TV Shows - THE KIDS ARE ALRIGHT ABC

Set in the 1970s, this ensemble comedy follows a traditional Irish-Catholic family, the Clearys, as they navigate big and small changes during one of America’s most turbulent decades. In a workingclass neighborhood outside Los Angeles, Mike and Peggy raise eight boisterous boys who live out their days with little supervision. The household is turned upside down when oldest son Lawrence returns home and announces he’s quitting the seminary to go off and “save the world.” Times are changing and this family will never be the same. There are 10 people, three bedrooms, one bathroom and everyone in it for themselves.

Single Parents

ABC 2018 New TV Shows - SINGLE PARENTS ABC

This ensemble comedy follows a group of single parents as they lean on each other to help raise their 7-year-old kids and maintain some kind of personal lives outside of parenthood. The series begins when the group meets Will, a 30-something guy who’s been so focused on raising his daughter that he’s lost sight of who he is as a man. When the other single parents see just how far down the rabbit hole of PTA, parenting and princesses Will has gone, they band together to get him out in the dating world and make him realize that being a great parent doesn’t mean sacrificing everything about your own identity.

Whiskey Cavalier

ABC 2018 New TV Shows - WHISKEY CAVALIER on ABC

Whiskey Cavalier is a high-octane, hour-long action dramedy that follows the adventures of tough but tender FBI super-agent Will Chase (codename: “Whiskey Cavalier”). Following an emotional breakup, Chase is assigned to work with badass CIA operative Francesca “Frankie” Trowbridge (codename: “Fiery Tribune”). Together, they lead an inter-agency team of flawed, funny and heroic spies who periodically save the world (and each other) while navigating the rocky roads of friendship, romance and office politics.

The Rookie

ABC 2018 New TV Shows - THE ROOKIE on ABC

Starting over isn’t easy, especially for small-town guy John Nolan who, after a life-altering incident, is pursuing his dream of being an LAPD officer. As the force’s oldest rookie, he’s met with skepticism from some higher-ups who see him as just a walking midlife crisis. If he can’t keep up with the young cops and the criminals, he’ll be risking lives including his own. But if he can use his life experience, determination and sense of humor to give him an edge, he may just become a success in this new chapter of his life.

Schooled

ABC 2018 New TV Shows - SCHOOLED on ABC

This spinoff of the hit series “The Goldbergs” will be set in 1990-something and follow the hilarious teachers of William Penn Academy – led by Tim Meadows (Principal Glascott), Bryan Callen (Coach Mellor) and AJ Michalka (Lainey Lewis) – who, despite their eccentricities and crazy personal lives, are heroes to their students.

ABC 2018 New TV Show Trailer

Watch these Trailers of upcoming ABC shoes for the 2018-19 season and tell us which of these ABC 2018 New TV Shows seem most exciting to you.



Comments

Leave a Reply

Your email address will not be published. Required fields are marked *